Whichever floor is connected in the IFC file while being imported, it is assigned a lower floor of that floor by ideCAD.
Regardless of how its position in space is defined in the IFC file, the floor is relatively redefined by ideCAD.
The slab position is re-determined according to the ceiling of the relevant floor.
The final coordinates are always guaranteed to be the same on both sides.
If there is an empty floor at the top, this floor is automatically deleted.
Regardless of the definition in the IFC file, all reinforced concrete floors are produced as load-bearing flooring on the ideCAD side.
If the structural material information matches with ideCAD as text, it is assigned directly, if not, the default reinforced concrete structural material is assigned.