Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
  • In TBDY 2018 Table 4.4 , there are conditions related to buildings where Equivalent Earthquake Load Method can be applied among the Linear Calculation Methods .

Image RemovedImage Added
  • Since the building we are calculating according to Table 4.4 is BYS = 3, the equivalent earthquake load method cannot be used. One of the modal analysis methods should be applied. There are also two modal analysis methods in the program, which are Mode combination and Mode Addition. The Mod Combination Method was used for this building .