Open a row by clicking the New button in the table above and change the name of New Floor Load to Tile cladding.
Go to the table below.
Define the tile itself in line 1 by clicking the New button: enter the name of the cladding, its thickness, unit load. The last line shows the load of this layer multiplied by them.
Define the mortar for the cladding in line 2 by clicking the New button: enter the name of the mortar, thickness, unit load. The last line shows the load of this layer multiplied by them.
By clicking the New button, define the leveling concrete for the tile in line 3:. Mortar name, thickness, unit loas are entered. The last line shows the load of this layer multiplied by them.
Define the plaster in line 4 by clicking the New button: its name, thickness, unit load are entered. The last line shows the load of this layer multiplied by them.
The tile cladding load value will be calculated automatically in the top table.
Usage step |
Defining the new slab load |
Defining the tile cladding in line 1 |
Defining themortar in line 2 |
Defining the levelling concrete in line 3 |
Defining the plaster in line 4 |
...
Next Topic