Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • In accordance with TBDY 2018 4.8.5.3, the Building Importance Factor for the lower part of the building is taken by taking I = 1, R = 2.5 and D = 1.5 and the horizontal elastic design spectrum reduced in both directions for the earthquake level DD-2 is determined.

...