Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Floor thickness can be increased.

  • Punching equipment can be used provided that the plate thickness is at least 250 mm.

  • Concrete class can be increased.

  • Column / curtain size can be increased.

  • If there are floor gaps in the punching perimeter, it can be canceled.

  • The distance of columns and curtains to the slab border or slab gaps can be increased.

...