Draw steel bar ids If checked, the pose numbers of the rebars are shown in the drawings. If not checked, it will not be displayed. |
Draw steel lengths If marked, the total length of the slab rebar along with the length of each bend in the formwork plan is written on the rebar. If not marked, only the total length of the rebar is written on the rebar. |
Arrange blocks by name In the expansions, the objects are marked if they want to be placed according to the element names while placing the layout on the layout. If not marked, the expansions are placed according to the principle of the most economical use of the layout. The name is ignored. Names can be mixed. Object names; For example, if beam is mentioned, they are names such as K101, K104 etc. The expansion is beam opening, foundation opening, rib opening, etc. |
Draw slab loads When the option is selected, the story loads in the story ceiling plan are shown in the formwork plan. |
Bend straight reinforcement in foundation details If marked, the flat reinforcement is drawn in the foundation opening by bending it into the beam on the non-continuous support. If unchecked, the straight reinforcement is left uncurled on the non-continuous support. |
Generate according to moment 0 point It is marked on the beams if it is desired to draw the piles by breaking according to the vertical calculation moment zero point. If not marked, the break point of the piles is 30 cm from the support or half the height of the beam. |
Anchorage length is 1/4 If it is checked, 1/4 and lb of the adjacent span is calculated, the mounting and piles are extended to the adjacent opening, whichever is greater. If unchecked it is only extended by 1b. (lb rebar lock length. For Lb calculation, see TS500.) |
Enable drawing organizer If it is checked, the program automatically shifts some text to remove the confusion in the drawings. |
All stories It prepares the drawings of all stories in one go. |
Min. distance between blocks Minimum horizontal distance between blocks is entered. The block is each opening itself, with its rebars, sections and dimensioning. |
Distance between lines Minimum vertical distance between blocks is entered. The block is each opening itself, with its rebars, sections and dimensioning. |
Max. height difference of blocks in a line The maximum height difference of each block in the row (vertical direction) is entered. If the difference between the height of the block to be placed and the height of the previously placed block is smaller than the value entered on this line, the layout is made. If it is large, no settlement is made. It is left to the next row. The block is each opening itself, with its rebars, sections and dimensioning. |
...