Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Parametric Limitations on Prequalification

Four-Bolt Unstiffened

Four-Bolt Stiffened

Eight-Bolt Stiffened

Parameter

Maximum
in. (mm)

Minimum
in. (mm)

Maximum
in. (mm)

Minimum
in. (mm)

Maximum
in. (mm)

Minimum
in. (mm)

tbf

3/4 (19)

3/8 (10)

3/4 (19)

3/8 (10)

1 (25)

9/16 (14)

bbf

91/4 (235)

6 (152)

9 (229)

6 (152)

121/4 (311)

71/2 (190)

d

55 (1400)

133/4 (349)

24 (610)

133/4 (349)

36 (914)

18 (547)

tp

21/4 (57)

1/2 (13)

11/2 (38)

1/2 (13)

21/2 (64)

3/4 (19)

bp

103/4 (273)

7 (178)

103/4 (273)

7 (178)

15 (381)

9 (229)

g

6 (152)

4 (102)

6 (152)

31/4 (83)

6 (152)

5 (127)

pfi , pfo

41/4 (114)

11/2 (38)

51/2 (140)

13/4 (44)

2 (51)

15/8 (41)

pb

-

-

33/4 (95)

31/2 (89)

Plastic hinges cause inelastic bending deformations in the joining beam and column panel zones. Therefore, panel zones should conform to the requirements of the AISC Seismic Provisions. In addition, Column-beam moment ratios should conform to the requirements of the AISC Seismic Provisions.

...