After analysis, you can access it by clicking on the Dome command under the Concrete Design title of the ribbon menu Analysis and Design tab .
...
Dome Concrete
...
Specifications |
---|
DS |
It is the rebar fixing column. If marked, the rebar is fixed. |
ID |
It is the name of the dome in the plan. (D01, D02, D012 etc.) In case of negativity, the term related to negativity is added next to the name. Like D09 (M). |
Story |
It is the name of the story where the dome is located. |
Req.As/Dir 1-Top It is the required reinforcement area calculated for direction 1-top in the dome. |
Dir 1 |
-top |
It is the value in diameter and number of rebars placed in direction 1 |
-top in the dome. |
Req.As/Dir 1-Bottom It is the required reinforcement area calculated for direction 1-bottom in the dome. |
Dir 1 |
-bottom |
It is the value in diameter and number of rebars placed in direction 1 |
-bottom in the dome. |
Req.As/Dir 2-Top It is the required reinforcement area calculated for direction 2-top in the dome. |
Dir 2 |
-top |
It is the value in diameter and number of rebars placed in direction 2 |
-top in the dome. |
Req.As/Dir 2-Bottom It is the required reinforcement area calculated for direction 2-bottom in the dome. |
Dir 2 |
-bottom |
It is the value in diameter and number of rebars placed in direction 2 |
-bottom |
in the dome. |
...