Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
TDY

TBDY, concrete and steel element reports of the project whose Analysis+Design is done.

View file
nameGenerate Select Reports.cde

  • Click the Analysis+Design (F9) command.

  • In the window that opens question will be asked that Do you want to perform analysis? question will be asked.

  • Click the Yes button.

  • Wait for the analysis to complete in the Analysis Status window.

  • After the analysis is complete, click the OK button to close the window.

...

  • In the Report Selections list, the titles for which the report will be created will be creating is marked.

  • In the Design by line of the Report Header section, enter the designer information.

  • Enter the revision information in the Revision line.

  • Enter the date information in the Date line.

  • Click on the Please Select Company Logo button from the Company Logo section .

  • Select Company Logo from the Load Image window and click the Open button.

  • Enter the building information in the Structure Information and Soil Group section.

...

  • With the Fit width command, the zoom is made automatically according to the page width.

  • Click the Show Index command in the ide Report.

...

  • Page header, section header, section sub header and table data font can also be changed.

  • Open the File list in ide Report and click Save As line.

...

  • The Report File Dialog will open.

  • Specify the name of the report to be filed from the File Name line.

  • Select PDF Files from the Save As Type list.

...

  • Press Click the Save button.

  • The select report is saved in pdf file format.

  • Open the saved pdf format file.

...

Follow the steps of the video below.

Widget Connector
overlayyoutube
_templatecom/atlassian/confluence/extra/widgetconnector/templates/youtube.vm
width746px
urlhttps://www.

...

youtube.com/watch?v=w2UG6GVB8Yg&list=PLxqm7PJuC2PszEtXjiiWhENO2lquMW4Eg&index=55
height420px