Copy the base story to upper in this section.

Previous steps have been followed in the project file named Copy Base Story to Upper. You can download the file and follow the steps given in this title on the project.

View file
nameCopy Base Story to Upper.cde

  • Select the objects you want to be copied to the upper story on the base story using the window selection method. (You can find detailed information about the selection method from Object Selection.)

  • Move your mouse to the top of the A-4 axis intersection and click the left button.

...

  • Objects remaining in the window you created will be selected. Also choose the axlesaxes.

...

  • To remove from the current selection, click on the wall and the door that between the axes 1 and 2 axles on the axis B axis, the zone edge of the space between the B and C axles axes on the axis 2 axle, the door between the axes B and C axes on the axis 3 axle, and remove the bathroom and kitchen space from the current selectionzones.

...

  • Click the story copy floor command.

  • In the story copy floor dialog, mark floor story 1.

  • Check the Copy copy only selected objects entities option and click the OK button.

...

  • The objects you selected have been copied upstairsupper. Deselect objects by pressing Esc key

...

Follow the steps of the video below.

Widget Connector
overlayyoutube
_templatecom/atlassian/confluence/extra/widgetconnector/templates/youtube.vm
width746px
urlhttps://www.youtube.com/watch?v=Y6iArgrk64g&list=PLxqm7PJuC2PszEtXjiiWhENO2lquMW4Eg&index=12