Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

This message is created at the beginning of the report by giving the name of the element and its solid.

For example, RD01 1st Basement Floor Reinforcement Insufficient

In the element whose name and solid is given, it means that the amount of reinforcement that will meet the reinforcement area calculated due to the design effects or the regulation could not be selected.

In raft floors, flat, pleated, additional reinforcements may be insufficient.

Possible solutions:

Uncheck the DS (reinforcement fixing) in the reinforced concrete dialogs.

  • You can increase the reinforcement diameters that can be used for the relevant element in the Reinforcement Selection dialog.

  • By increasing the dimensions of the relevant element, you can reduce the amount of reinforcement needed.

  • In the element reinforced concrete dialog, you can give the required reinforcement amount yourself by looking at which type of reinforcement the missing reinforcement has been created.

 

  • No labels