Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Current »

  • In TBDY 2018 Table 4.4, there are conditions related to the buildings where the Equivalent Earthquake Load Method among the Linear Calculation Methods can be applied.

  • Since the building we are designing according to Table 4.4 is BYS=6, the equivalent earthquake load method can be used. The Modal Combination Method, which is inclusive and can be used in all buildings, has been used for design.


  • No labels