When you define an inclined system with the Incline Objects command, the elevation of the beams and columns automatically changes. You can follow the defined system from 3D view.

The Bevel Incline Objects command can be used to make a floor slab with a horizontal position with undefined elevations.

  • Create the flooringslab ( Creating a Slab ).

  • After clicking the tile icon, click the Slope Incline Objects icon in the toolbar that appears   .

  • Select floors slabs that you would describe as slanted flooringincline slab.

  • Press the right mouse button again. The program "Would you like to also select slab bound objects?" Some objects at slab boundaries are not selected. Selecting slab’s boundaries for setting incline as a whole structure recommended. Do you want to select slab boundary objects?” will ask the question.

  • Click the OK button.

  • Click two points in turn to indicate the direction you want to bevelincline. The first point you choose will determine the beginning of the slope incline plane.

  • The Slope Incline Options dialog will open after the process . Enter the slope related parameters in the dialog.

  • When you click the OK button, the slope will occur.

The parameters available in the slope incline options dialog are:

...

...

Starting level

Image Removed

Specifications

Explained

Starting point

Indicates the location from which the slope will start. The values ​​given in the starting point section indicate from which elevation the beginning of the slope will begin.

Descriptions

Start level

Image Added

Give the starting start level according to the selected level.

According to the floor ceiling

Image Removed

Relative to story top

Image Added

The elevation value given is taken from the floor top of the floorstory.

According

Relative to

floor base

story bottom

Image RemovedImage Added

The elevation value given is taken from the floor bottom of the floorstory.

Global

Image RemovedImage Added

The level value given is taken from the generally defined zero elevation of the floorstory, independent of the floors stories worked.

End level

Ending elevation = starting elevation +

Image RemovedImage Added

In the direction of the given slope direction, the end level is found by adding the value entered in the box and the starting level. A negative value can also be entered to change the direction of the slope.

Pain

Use slope angle

Image RemovedImage Added

Objects selected according to the given angle value are arranged inclined.