With the Edit Concrete Calculation Line command, the working style of the slab and the type of reinforcement are changed. As a result of the slab analysis, the way the slab works and what type of reinforcement will be used are automatically determined. With the Edit Concrete Calculation Line command, you can change the working style of the slab and the type of reinforcement.
Location of Edit Concrete Calculation Line Command
...
Options |
---|
Calculate required reinforcement If the option is checked, the reinforcement value found as a result of the calculation is used. (The amount of reinforcement found from the design moment is compared with the minimum reinforcement ratios, whichever is greater is used). |
Use same as bottom reinforcement The moment is at the bottom in the opening in the slab. When this option is checked, it means that the same bottom reinforcement will be used on the top for slab. |
Use given reinforcement If checked, the reinforcement entered in this line is used instead of the reinforcement found as a result of the calculation. The program assigns partial reinforcement in addition to the regions where the entered reinforcement is not sufficient (the moment peaks). Reinforcement that meets at least the minimum requirements should be used. (The supplied reinforcement must meet the minimum reinforcement requirement). |
Bend steel If checked, the straight bar is bent into the beam at the beginning and end. If not marked, the reinforcement is left unbend. |
Calculate required reinforcement for whole area If marked, the reinforcement calculation is made to meet the maximum moment in the region within the distance where the reinforcement axis is valid. If it is not marked, only the concrete calculation is made to meet the moment on the reinforcement axis. |
...