Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Conditions that must be provided for moment-transmitting connections with bolted head plate are controlled as specified in TBDY APPENDIX 9B. The joint model according to TBDY 2018 Figure 9B.5 is made automatically.

...

The Requirements to be Fulfilled

...

  • The following conditions are automatically controlled for column flange to beam flange connection in accordance with 9B.4.6.

  • The beam flange will be connected to the column flange with complete joint penetration groove weld.

  • Weld access holes will have the geometry and application conditions given in Figure 9B.6.

  • The dimensioning of the connection is automatically computed using Eq. 9B.1 with Cpr = 1 as required by -9B.4.3.

...

Prequalification Limits

...