Bearing capacity of strip foundation is insufficient.
Bearing capacity of strip foundation is insufficient.
Continuous foundation means that the base pressure value exceeds the Ground Bearing Force (q t ) value entered in the Analysis Settings dialog .
This message is created at the beginning of the report by giving the name of the element and its solid.
For example, TK18 Bearing capacity of foundation is insufficient.
Solution:
Increase the size of Ampatman.
After the solution processes, the analysis should be repeated.
, multiple selections available,
Related content
Strip Foundation Reinforcements
Strip Foundation Reinforcements
More like this
Strip Foundation Design Setting Section
Strip Foundation Design Setting Section
More like this
Strip Foundation Parameters
Strip Foundation Parameters
More like this
Requires double reinforcement
Requires double reinforcement
More like this
Insufficient Reinforcement in Column
Insufficient Reinforcement in Column
More like this
Raft Foundation Reinforcements
Raft Foundation Reinforcements
More like this