Maximum Pursmail Exceeded Shearwall.
Maximum Pursmail Exceeded Shearwall.
This message is created at the beginning of the report by giving the name of the element and its solid.
For example, P1 1st floor Maximum pursuit exceeded
In the element given its name and solid, it means that the required reinforcement ratio calculated from the design effects exceeds the upper limit reinforcement ratio given in the regulation.
Possible solutions:
The analysis should be repeated by enlarging the sections of the relevant element.
Next Topic
Related Topics
, multiple selections available,
Related content
Maximum Pursmail in Colon Exceeded.
Maximum Pursmail in Colon Exceeded.
More like this
Maximum Percentages in Beam Exceeded.
Maximum Percentages in Beam Exceeded.
More like this
Strip Footing Maximum Pursmail Exceeded.
Strip Footing Maximum Pursmail Exceeded.
More like this
Insufficient Reinforcement in Shearwall
Insufficient Reinforcement in Shearwall
More like this
Longitudinal rebar less than Ø14 cannot be used in shearwall head reinforcement area.
Longitudinal rebar less than Ø14 cannot be used in shearwall head reinforcement area.
More like this
Shearwall shear safety is not satistied
Shearwall shear safety is not satistied
More like this