Panel Hydrostatic Load

Water pressurized soil load is added to the shearwalls with the Panel Hydrostatic Load command.

Location of Panel Hydrostatic Load Command

You can access it from the Add Load heading in the Modify tab in the Ribbon menu .

Usage Steps

  • Click on the Panel Hydrostatic Load icon.

  • Click the shearwall.

  • Click the right mouse button.

  • The Hydrostatic Load dialog will open.

  • Define the values ​​by following the lines in the dialog.

Hydrostatic Load Dialog

Specifications

Water level (global)

The water level elevation is entered for the water load to be added.

Reverse load direction

Changes the direction of the defined load.

 

Next Topic