/
Period Check for Rigid Basement Assumption

Period Check for Rigid Basement Assumption

For rigid basement story structures, the required period control in TBDY 2018 Article 3.3.1.1.b is automatically performed in the program and is  given under the heading "Period Check for Rigid Basement Assumption" in dynamic analysis reports.

Usage steps:

  • Analyze after defining the rigid story structure.

  • Get a dynamic analysis report.


Related content

Period Requirement for Structures Including Rigid-Basement Floors (3.3.1)
Period Requirement for Structures Including Rigid-Basement Floors (3.3.1)
More like this
Rigid basement condition is not provided.
Rigid basement condition is not provided.
More like this
TSC-2018 - Period Requirement for Structures Including Rigid-Basement Floors (3.3.1)
TSC-2018 - Period Requirement for Structures Including Rigid-Basement Floors (3.3.1)
More like this
Building Height and Building Height Class.
Building Height and Building Height Class.
More like this
All floors are defined as rigid basement floors.
All floors are defined as rigid basement floors.
More like this